Laserfiche WebLink
<br />6.2 Compaction (General) <br />' After each layer of fill material has been placed, spread, and <br /> moisture conditioned, the layer shall be compacted by passing <br /> compaction equipment over the entire surface of the layer a <br /> sufficient number of times to obtain the required compaction <br />t determined on the basis of the specified quality assurance tests. <br /> Should the surface of the fill become rutted or uneven subsequent <br />' to compaction, it shall be re-leveled before the next layer of fill <br />i <br />l <br />d <br /> s p <br />aced an <br />, if required by the Engineer, recompacted by and at <br /> the expense of the Contractor. <br /> <br /> Compaction shall be accomplished by approved equipment. The <br />' Engineer will continuously evaluate the Contractor's equipment and <br /> methods. If such equipment or methods are found unsatisfactory for <br /> the intended use, the Engineer will require the Contractor to <br />' replace the unsatisfactory equipment with other types or adjust <br /> methods until proper compaction is achieved. Compaction for <br /> cohesive soils shall be based on ASTM D 698. A minimum compaction <br /> of 95 percent of the laboratory Standard Proctor dry density shall <br />' be achieved. Compaction of cohesionless soils shall alsc be to 95 <br /> percent of standard Proctor dry density where applicable, and based <br /> on method specification elsewhere. <br />' Insofar <br />i <br />t as practical, the material shall be brought to the <br />fill <br />i <br />l <br />t i <br />th <br />t <br />t <br />t <br /> proper mo <br />ure con <br />en <br />pr <br />or <br />s <br />o acemen <br />e <br />. <br />p <br />n <br /> Supplementary water, if required, may be added to the material by <br /> sprinkling on the fill and it shall be mixed uniformly throughout <br /> the layer by h;.rrowing or blading prior to compaction of the layer. <br />' Such addition of water is subject to the approval of the Engineer. <br />6.3 Leach Pad Base <br />' The leach pad base shall be constructed of native materials as <br />described in Section 5.2. The material shall be placed in <br />horizontal loose lifts not exceeding 12 inches in thickness. The <br />N-12 <br />