My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46297
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:31 PM
Creation date
11/20/2007 12:42:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
APPENDIX N TECHNICAL SPECIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.2 Compaction (General) <br />' After each layer of fill material has been placed, spread, and <br /> moisture conditioned, the layer shall be compacted by passing <br /> compaction equipment over the entire surface of the layer a <br /> sufficient number of times to obtain the required compaction <br />t determined on the basis of the specified quality assurance tests. <br /> Should the surface of the fill become rutted or uneven subsequent <br />' to compaction, it shall be re-leveled before the next layer of fill <br />i <br />l <br />d <br /> s p <br />aced an <br />, if required by the Engineer, recompacted by and at <br /> the expense of the Contractor. <br /> <br /> Compaction shall be accomplished by approved equipment. The <br />' Engineer will continuously evaluate the Contractor's equipment and <br /> methods. If such equipment or methods are found unsatisfactory for <br /> the intended use, the Engineer will require the Contractor to <br />' replace the unsatisfactory equipment with other types or adjust <br /> methods until proper compaction is achieved. Compaction for <br /> cohesive soils shall be based on ASTM D 698. A minimum compaction <br /> of 95 percent of the laboratory Standard Proctor dry density shall <br />' be achieved. Compaction of cohesionless soils shall alsc be to 95 <br /> percent of standard Proctor dry density where applicable, and based <br /> on method specification elsewhere. <br />' Insofar <br />i <br />t as practical, the material shall be brought to the <br />fill <br />i <br />l <br />t i <br />th <br />t <br />t <br />t <br /> proper mo <br />ure con <br />en <br />pr <br />or <br />s <br />o acemen <br />e <br />. <br />p <br />n <br /> Supplementary water, if required, may be added to the material by <br /> sprinkling on the fill and it shall be mixed uniformly throughout <br /> the layer by h;.rrowing or blading prior to compaction of the layer. <br />' Such addition of water is subject to the approval of the Engineer. <br />6.3 Leach Pad Base <br />' The leach pad base shall be constructed of native materials as <br />described in Section 5.2. The material shall be placed in <br />horizontal loose lifts not exceeding 12 inches in thickness. The <br />N-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.