Laserfiche WebLink
<br />• PROJECT - Revegetation <br />EQUIPMENT: IOB Dozer <br />Rangeland Drill <br />Disc <br />ASSUMPTIONS: <br />Time required for revegetation is based on actual field experience at <br />Seneca II Mine. <br />SEEDING: <br />Time Equipment Cost/Hour Total/Acre <br />2.5 Dozer $18.95 $47.38 <br />1.5 Drill 12.00 18.00 <br />I.0 Disc 2.50 2.50 <br />• 2.5 Dozer Operating Cost <br /> (Fuel, Oil, etc.) 10.30 25.75 <br />2.5 Labor 14.33 35.83 <br /> Seed+ 23.00 <br /> $152.46/acre <br /> * Based on price quote from Arkansas Valley Seed Company and price <br /> per pound of pure live seed. <br />Areas to be Seeded: <br /> 6 acres mined land = $914.76 <br /> 4 acres stockpiles = 609.84 <br /> 2 acres haul road = 304.92 <br /> TOTAL REVEGETATION COST $1,829.52 <br />• <br />L-10 <br />