My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46030
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:19 PM
Creation date
11/20/2007 12:34:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982036
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT L - RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT -Topsoil Replacement <br />EQUIPMENT: 637 "D" P-P Scraper <br />ASSUMPTIONS: <br />Efficiency = 80% <br />Altitude Adjustment = 93.5% <br />RR = 6% <br />Topsoil will come from one or more topsoil stockpiles to be replaced on <br />the backfilled pit(s). Average depth of replacement equals approximately <br />2 feet. <br />Average haul distance one way = 1,000 feet <br />PRODUCTION = 500 cubic yards/hour (Cat Handbook, p. 218) <br />ACTUAL PRODUCTION = Ideal x Alt. Adj. x Eff. <br />=500x.935x.80 <br />= 374 cubic yards/hour <br />VOLUME/AREA: <br />Mine Area = 10,000 cubic yards (2 years of mining from field, <br />average of 5,000 cubic yards/year) <br />Haul Road Area = (2640'L x 30'W x 2'D) <br />27 cu, ft./cu. yd. <br />= 5,900 cubic yards <br />= 15,900 cubic yards (total both areas) <br />TIME = 15,900 cubic yards 1374 cubic yards/hour <br />= 42.5 hours <br />= 5.3 shifts <br />• COST= 5.3 shifts x $1,683.59 <br />_ $8,923.03 <br />L-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.