Laserfiche WebLink
r1 <br />~~ <br />• <br /> <br /> <br />BOND AMOUNT <br />Operation <br />Open Pit <br />Haul Road (Total) <br />Topsoil Replacement <br />Revegetation 1 <br /> <br />Aooroximate Area Total Cost <br />2 acres $15,152.31 <br />2 acres 11,297.61 <br />6 acres 8,923.03 <br />12 acres 1,829.52 <br />12 acres (total) $37,202.47 <br />I The open pit, haul road, and topsoil replacement acreages are all included <br />in the 12 acres for revegetation. The rest of the permit area will either <br />be undisturbed or revegetated and awaiting bond release. If these areas <br />should require any additional work (i.e. patching erosion areas, replant- <br />ing), the maximum bond should be $100.00/acre to cover these costs. <br />Total Acres Total Bond <br />12.0 Acres $37,202.47 <br />24.3 Acres 2,430.00 <br />36.3 Acres (total permit) $39,632.47 <br />L-II <br />Revised May 13, 1982 <br />