My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45966
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:16 PM
Creation date
11/20/2007 12:33:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980002
IBM Index Class Name
Permit File
Doc Date
2/21/1980
From
IMPACT THE ENVIRONMENTAL SCIENTISTS&ENGINEERS
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />3,2!)9 plus acres of contiguous land. <br />Since the Tucker make up water requirements are anticipated to 6e <br />approximately 130 gpm, the entitlements in the Foxhills formation for this <br />acreage are snore than adequate for the operation of the facility. <br />A contingency plan has been developed for Tucker Construction Company's <br />water supply as a backup system. Tucker has obtained permission from Howard <br />I, lioltzinger to utilize Mr. HoTtzinger's Mantey reservoir rights to Lone <br />Cre~sk. Those rights are listed below. <br />Mantey Reservoir Water Rights T12N, R67W <br />Reservoir N Section Quantity (Acre Feet) <br />1 32 3.50 <br />2 32 0.87 <br />3 32 <br />5 32 <br />70.00 <br />3.00 <br />5 29 2.90 <br />6 31 45.00 <br />7 31 4.00 <br />Total 129.27 <br />The place of use of the Mantey Reservoir Rights will be T11N, R67W <br />Section 17. It is anticipated that water will be diverted to the sediment <br />control pond during the free river period for Lone Tree Creek. Make up <br />water under the contingency plan will be supplied from the Mantey Reservoir <br />System under existing appropriations. This would seem to be in accordance <br />with the Colorado statutes since reservoir character other than beneficial <br />uses is not specific. Since the make up water requirement for the Tucker <br />Cor~struction Company operation is currently estimated to be approximately 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.