Laserfiche WebLink
<br /> <br />3,2!)9 plus acres of contiguous land. <br />Since the Tucker make up water requirements are anticipated to 6e <br />approximately 130 gpm, the entitlements in the Foxhills formation for this <br />acreage are snore than adequate for the operation of the facility. <br />A contingency plan has been developed for Tucker Construction Company's <br />water supply as a backup system. Tucker has obtained permission from Howard <br />I, lioltzinger to utilize Mr. HoTtzinger's Mantey reservoir rights to Lone <br />Cre~sk. Those rights are listed below. <br />Mantey Reservoir Water Rights T12N, R67W <br />Reservoir N Section Quantity (Acre Feet) <br />1 32 3.50 <br />2 32 0.87 <br />3 32 <br />5 32 <br />70.00 <br />3.00 <br />5 29 2.90 <br />6 31 45.00 <br />7 31 4.00 <br />Total 129.27 <br />The place of use of the Mantey Reservoir Rights will be T11N, R67W <br />Section 17. It is anticipated that water will be diverted to the sediment <br />control pond during the free river period for Lone Tree Creek. Make up <br />water under the contingency plan will be supplied from the Mantey Reservoir <br />System under existing appropriations. This would seem to be in accordance <br />with the Colorado statutes since reservoir character other than beneficial <br />uses is not specific. Since the make up water requirement for the Tucker <br />Cor~struction Company operation is currently estimated to be approximately 31 <br />