Laserfiche WebLink
Section 780.14 (b) Continued. <br />• (7) Each air pollution collection and control facility; <br />No air pollution monitoring devices are used or required at the <br />Kerr Mine Area or Kerr Tipple Area. Air pollution control facili- <br />ties at the Kerr Tipple Area are shown on Figure 12, Kerr Tipple <br />Layout and Figure 13, Kerr Tipple Crushing Facilities. <br />(8) Each source of waste and each waste disposal facility relating to <br />coal processing or pollution control; <br />Kerr Coal performs no cleaning of coal and therefore has no coal <br />processing waste or disposal areas. With the exception of used oil <br />and lubricants, all non-coal wastes will be buried in the pit as <br />• discussed under Section 816.89. The location of the used oil ponds <br />is shown on Map 28, Kerr Mine Area Existing Structures. <br />(9) Each facility to be used to protect and enhance fish and wildlife <br />and related environmental values; <br />Several maps are used to show the facilities to be used to protect <br />and enhance fish and wildlife and related environmental values. <br />The stream buffer zones are shown on Map 1, Kerr Mine Area Mine <br />Plan. The location and boundaries of reference areas for deter- <br />mining revegetation success are shown on Map 18, Kerr Mine Area <br />Vegetation and Map 19, Kerr Tipple Area Vegetation. Sediment <br />control and water diversion facilities are shown on Map 16, Kerr <br />Mine Area Surface Water Hydrology and Map 17, Kerr Tipple Area <br />Hydrology. Surface water and ground water quality sample sites to <br />780-32 <br />