Laserfiche WebLink
Section 780.14 (b) Continued. <br />Revised 11/20/80 <br />be used in the future are located on Map 15a, Kerr Mine Area Ground <br />Water Hydrology, Map 16a, Kerr Mine Area Surface Water Hydrology <br />and Map 17a, Kerr Tipple Area Hydrology. Fences to be constructed <br />around the active mining areas will be constructed in accordance <br />with the request of S1r4I found on page 30 of Exhibit 51, Coal Lease <br />~ Application C-22777 Environmental Assessment. The approximate <br />locations of the fences are coincident with the topsoil removal <br />boundaries shown on Map 3~a, Kerr Mine Area Soil Removal and Stor- <br />age. A typical fence cross-section is found in Figure 37, Typical <br />Fence Cross-Sections. <br />(10) Each explosive storage and handling facility; and <br />The explosive storage and handling facility location iS shown on <br />Map 28a, Kerr Mine Area Existing Structures. <br />(11) Location of each sedimentation pond, permanent water impoundment, <br />coal processing waste bank, and coal processing waste dam and embank- <br />ment, in accordance with 30 CFR 780.25, and fill area for the disposal <br />of excess spoil in accordance with 30 CFR 780.35. <br />The location of each sedimentation pond is shown on Map 16a, Kerr <br />Mine Area Surface Water Hydrology and Map 17a, Kerr Tipple Area <br />Hydrology. Kerr Coal will have no permanent water impoundments, no <br />coal processing waste banks, no coal processing waste dams and <br />embankments and no excess spoil materials. <br />780-33 as <br />