My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45071
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:29 PM
Creation date
11/20/2007 12:11:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
9/26/2007
Section_Exhibit Name
Part 780 Reclamation and Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 780.12(b) Continued. <br />Major mechanical repair work on the equipment fleet is performed at <br />the shop on a three-shift, five-day-a-week schedule with weekend work <br />scheduled as necessary. Welding on any breaks or cracks in the <br />equipment is performed by qualified welders from this shop. The <br />warehouse contains an inventory of small equipment parts for use in <br />the comprehensive maintenance program with outside storage of the <br />larger inventory parts because of limited covered building space. <br />Offices located within this building are in the southwest corner <br />(main office) and on the north side (maintenance office). The main <br />office houses Kerr Coal's Mine Operations, Accounting, and Payroll <br />Departments. The maintenance office houses the Maintenance <br />Department. <br />Also located within the main building are a tube and wash bay and an <br />employee change room. The mobile equipment fleet at the mine is <br />generally serviced with lubricants and oil changes in the tube and <br />wash bay. Muddy equipment is cleaned before and after any <br />maintenance work. Employees use the change house in the shop to <br />change out of and into their street clothing and to take showers. <br />Additional structures adjacent to the shop, office, and warehouse <br />complex include diesel-fueling and gasoline-fueling stations for both <br />large mobile mine equipment and the mine pick-up truck fleet. Mobile <br />equipment and employee vehicle parking areas are also provided at the <br />complex. <br />Drainage from the shop and warehouse complex is collected in <br />sedimentation pond C, as shown on Map 16a, Kerr Mine Area Surface <br />Water Hydrology. This structure was completed during the summer of <br />1980 and has been designed to meet the performance standards of Sub- <br />chapter K. Plans and specifications for this pond are found in <br />~, Exhibit 42, Drainage and Sediment Control Plan. <br />780-16R Revised - January, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.