Laserfiche WebLink
Section 780.12 (b) Continued. <br /> <br />(2) A construction schedule which shows dates for beginning and com- <br />pleting interim steps and final reconstruction; <br />(3) Provisions for monitoring the structure during and after modifi- <br />cation or reconstruction to ensure that the performance standards of <br />Subchapter K of this Chapter are met; and <br />(4) A showing that the risk of harm to the environment or to public <br />health or safety is not significant during the period of modification or <br />reconstruction. <br />As stated earlier, mining operations have been conducted at the <br />Marr Mine since 1974. The structures currently in place at the <br />Marr Mine are shown on Map 28, Kerr Mine Area Existing Structures, <br />and Map 29, Kerr Tipple Area Existing Structures. <br />• <br />The existing structures can be classified as follows: <br />Shop, Office, Warehouse Complex <br />Kerr Tipple Facility <br />Overburden Stockpile <br />Topsoil Stockpiles <br />Explosives Bunker <br />Railroad <br />Sedimentation Ponds <br />Power Lines <br />Haul Roads <br />Shop;'Office, Watehouse Compleic <br />Kerr Coal maintains a complete maintenance shop, office, and ware- <br />house facility at the Marr Mine covering approximately 10.2 acres <br />in Section 35, Township 9 Notth, Range 78 West. <br />-'~ <br />780-15 <br />