Laserfiche WebLink
Doc Date:1 211 112 0 01 <br />Section 780.11(b) Continued. <br /> <br />III IIIIIIIIIIIIIIII <br />times per shift. Drilling and blasting will be conducted with due <br />regard for the control of fugitive emissions. Air pollution con- <br />trol plans and techniques are discussed in greater detail in Sec- <br />tion 780.15. <br />S~~ Section 780.12 Operation plan: Existing structures. <br />(a) Each application shall contain a description of each existing <br />structure proposed to be used in connection with or to facilitate the <br />surface coal mining and reclamation operation. The description shall <br />include - <br />(1) Location; (2) Plans of the structure which describe its current <br />condition; (3) Approximate dates on which construction of the existing <br />• structure was begun and completed; and (4) A showing, including rele- <br />vant monitoring data or other evidence, whether the structure meets the <br />performance standards of Subchapter K (Permanent Program Standards) of <br />this Chapter or, if the structure does not meet the performance stan- <br />dards of Subchapter K of this Chapter, a showing whether the structure <br />meets the performance standards of Subchapter S (Interim Program Stan- <br />dards) of this Chapter. <br />(b) Each application shall contain a compliance plan for each existing <br />structure proposed to be modified or reconstructed for use in connection <br />with or to facilitate the surface coal mining and reclamation operation. <br />The compliance plan shall include -- <br />(1) Design specifications for the modification or reconstruction of the <br />structure to meet the design and performance standards of Subchapter K <br />of this Chapter; <br />• <br />780-14 <br />