Laserfiche WebLink
<br />Section 780.11(b) Continued. <br />Impoundments. <br />To control runoff and protect surface water quality, Kerr Coal <br />proposes a total of 7 sedimentation ponds or series of sedimentation <br />ponds within the Mine Plan Area, and one pond within the Kerr Tipple <br />Area (Map 16a, Kerr Mine Area Surface Water Hydrology, and Map 17a, <br />Kerr Tipple Area Hydrology, show the locations of the sedimentation <br />ponds). All sediment ponds have previously been constructed. All <br />ponds have been constructed or reconstructed to comply with the <br />requirements set forth in 30 CFR 816.45 - 816.49. <br />Construction of sedimentation ponds was performed by trained Kerr <br />Coal personnel or by experienced contractors supervised by Kerr Coal <br />engineers. All construction has been accomplished before any <br />disturbance of the Mine Plan Area served by the pond. <br /> <br />- 780-8 aR Revised -January, 1991 <br />