Laserfiche WebLink
Page 23 <br />Hazd RocklMetal Mining Rule 1 <br />(2) Designated Mining Operations which qualify for permits under Section <br />34-32-112, C.R.S. 1984, as amended, but which affect less than fifty (50) acres and <br />extract less than one (1) million tons per year, which shall be referred to as "112d-1" <br />permits - $2,500; <br />(3) Designated Mining Operations which qualify for permits under Section <br />34-32-112, C.R.S. 1984, as amended, which do not qualify as 112d-1 permits, but <br />which affect less thaa one hundred (100) acres and extract less than five (5) million <br />tons per yeaz, which shall be referred to as "112d-2" permits - $4,000; and <br />(4) any other Designated Mining Operation which shall be referred to as <br />"112d-3" permits - $7,000. <br />(5) Fees for all other applications for new Permits or Modifications to <br />existing Permits aze as specified in Section 34-32-127, C.R.S. 1984, as amended. <br />1.6 PUBLIC NOTICE PROCEDURES <br />106(1)(d) . ~ 1.6.1 OfficeBoard Procedures -Permit Application Decision Dates <br />(1) The Office shall give such notice for all types of mining operations, <br />including applications for: <br />(a) 110 and 110d Limifed Impact Operations; <br />(b) 112 and 112d Reclamation Operations. <br />(2) The Office shall give notice, as required by this Section 1.6 and the <br />foIlowing specific provisions, of the decision date of the application to: <br />(a) the Operator; <br />rov(e) (b) the county(s) in which the proposed nvning operation is to be <br />located; <br />rov(e) (c) any municipality within two (2) miles of the proposed muting <br />operation; and <br />