My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44808
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:15 PM
Creation date
11/20/2007 12:03:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
6/9/2006
Doc Name
Reclamation Bond Cost Estimate
Section_Exhibit Name
Exhibit 2.03-E3 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 060 <br />Date : 04/05/2006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />Permitlobp : C-81-022 <br />Abbreviation :none <br />Filename :C022-060 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />task description :Remove Gravel from Substation No. 3 to Sediment Pond <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br /> Utilization <br />Ownership cost/hour : $56.94 NA <br />Operating cost/hour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit coslRiour : $194.45 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 645 CCY factor : 1.060 volume : 684 <br />Source of estimated volume : Drawilg 5-091 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 .feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Drv. non-cohesive <br />Average push gradient <br />Average site altitude <br />2.00 <br />6, 200 <br />(pos) <br />feet <br />Material weight : 2,850 Ibs/LCY <br />Weight description <br />Gravel -Dry (1/4"-2"diam.) <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) <br />Unit cost : $0.502 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />0.75 <br />0.80 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.81 <br />1.00 <br />0.31 <br />$583.36 <br />LCY <br />Source <br />Adjusted unit production <br />Adjusted fleet production <br />387.37 LCY/hr <br />1,162.12 Lcv/nr <br />Total job time <br />Total job cost <br />0.59 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.