Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />065 State :Colorado Permitfjob # :C-81-022 <br />04/052006 County :Delta Abbreviation :none <br />JRS Site :Sanborn Creek Mine Filename : C022-065 <br />Permit or other job action :2006 Midterm Review <br />task description :Replace Topsoil from Stockpile to Previously Disturbed Elk Creek Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Cost BrE <br />Equipment Description <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area : NA <br />Road maintenance -Motor grader :NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $82.59 NA NA NA NA NA <br />OperatingcosUhour: $180.99 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />OperatorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $288.53 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $577.06 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $577.06 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,500 CCY factor : 1.125 volume : 1,688 LCY <br />sheet 1 of 2 <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />