Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 059 <br />Date : 04/052006 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />PenniUob#:C-81-022 <br />Abbreviation :none <br />Filename : C022-059 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :2006 Midterm Review <br />Task description : Regrade Pond D <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank dooer <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br />Operating costlhour : $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $32.53 ~ NA <br />Total unit cosUhour : $194.45 Total fleet cosUhour ; $583.36 <br /> <br />MATERIAL UANTITIES <br />Initial Swell Loose <br />volume: 11,000 CCY volume <br />Unadjusted hourly production : 805.3 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (I <br />Average site altitude : 6,200 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Ea Rh <br />1.165 <br />Horsepower: 405 <br />Shift basis : 1 per day <br />12,815 LCY <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.79 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.28 <br />Adjusted unit produMion <br />Adjusted fleet producion <br />225.14 <br />675.42 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) Total job time : 18.97 Hours <br />Unit cost : $0.864 /LCY Total job cost : $11,068 <br />factor <br />