PERMFILE44789
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:14 PM
Creation date
11/20/2007 12:03:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977302
IBM Index Class Name
Permit File
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ~ to 20'. This phase will requite approximately 36 months. 7'he areas <br />worked at this time will be about 16 acres. <br />Phase 4. Areas V, VI, C and B will be quarried for limestone. Areas <br />VIII, IX, F and G will be stripped. Sandstone from area VIII, and IX <br />will be used to cover area IV, V, and VI at a depth of 2' to 10' and will <br />cover 50% of the area. Overburden from areas F and G will be backfilled <br />into area A, B, C, E and F at a depth of 2' to 20' and cover approximately <br />60% of the area. This phase will require approximately 36 m~~nths. The <br />area worked at this time will be about 28 acres. <br />Phase S. Areas VII, VIII, IX, E, F and G will be quarried for limestone. <br />i Areas X, N 1/2 XII will be stripped. Sandstone from area X Trill be used <br />to backfill areas VIII and IX to a depth of 2' to 15' covering about <br />70% of the area. Sandstone from area N 1/2 XII will be backfilled into <br />i • area IX and X to a depth of 2' to 15' and will cover about SOY of the <br />I <br />area. This phase will require approximately 60 months. The area to be <br />' worked at this time will be about 22 acres. <br />Phase 6. Area X, XI and XII will be quarried for limestone. Area <br />S 1/2 XII will be stripped. Sandstone from area S 1/2 XII will be <br />backfilled into areas VII, X, XI and XII to a depth of 2' to LS' covering <br />about 40% of the area. This phase will require approximately 60 months. <br />The area to be worked at this time will be about 14 acres. <br />•~ <br />