-- EXHIBIT D <br />MINING PLAN <br /> Phase I. Area I(L) will be quarried and the limestone will be <br /> removed. This will be accomplished by conventional open pit drilling <br /> and blasting methods. The limestone will be loaded and hau.Led to the <br /> crushing and stockpile area for processing and sizing. Dur:Lng this <br />p time areas A(g) and D(g) will be stripped of the sandstone overlaying <br />' the limestone. This material will be removed by conventional open <br /> pit drilling and blasting methods. The sandstone overburden will be <br /> loaded and hauled to enlarge the crushing and stockpiling area as <br /> designated on the accompanying map. This phase will require: approx- <br /> imately 24 months. The approximate area worked at this time: will be <br />~ 12.93 acres. <br />• Phase 2 <br />Area II <br />uarried for limestone alon <br />will be <br />with A <br /> . <br />(L) <br />q <br />g <br />(L) <br />.. <br />~ Area IIIS and B(S) will be stripped. The sandstone from area III(S) <br /> will cover approximated SOY, of area I with a depth from 1' to 10'. <br /> The sandstone from area B(S) will be used to finish enlarging the <br /> stockpile area. This phase will require approximately 36 months. The <br /> <br />i approximate areas worked at this time will be 14 acres. <br />I <br />Phase 3. Area III, IV, and D will be quarried far limestone. Area V, <br /> VI, C and E will be stripped. The sandstone is area V will be backfilled <br /> into area III at a depth of 2' to 10' and will cover the entire area. <br />Overburden in area VI will be backfilled into areas I and II at a depth <br />of 2' to 10' and will cover 70% of the area. Overburden from area C <br />will be backfilled into area A at a depth of 2' to 15' and will cover <br />70Y, of the area. Stripping from area E will be dumped in the upper 1/2 <br />section of area D at a depth of 10' <br />