Laserfiche WebLink
<br />ESTIMATED <br />ACTIVITY TIME FRAME <br />Re-test soils in areas showing less vegetative Completed !0/98 <br />cover; evaluate suitability parameters. <br />Evaluate revegetation success on reclaimed Completed 10/98 <br />mine site (year 3 evaluation). <br />Submit report to the Division, including soil Completed, and submitted with 1998 <br />and vegetation data, documenting vegetation Annual <br />success and reclamation recommendations. Reclamation Report <br />Perform interseeding and fertilizer application Complete by end of 1999 Fall <br />on non-topsoiled RDA slope areas (approx. S.0 seeding period. <br />acres), as approved by the Division. Proposed <br />work to include application of chemical <br />fertilizer (20-20-10 per C.S.U. evaluation), <br />and drill seeding and/or broadcast seeding at <br />• the approved seeding rate. Seeding will be <br />done in approximately IS feet wide strips, <br />along the contour, with 15 feet wide strips <br />between left undisturbed. <br />Construct closed contour furrows on areas Complete by November 1999 <br />exhibiting rills and gullies, constructed in <br />accordance with Rill and Gully Plan. <br />Constru~~tion of Refuse Ditch No. l Extension Complete by November 1999 <br />Removal of temporary diversion ditches. Complete within 6 months of approval <br />of Phase II bond release. <br />Construct approved post-mining drainage and Complete within 6 months of approval <br />sediment controls subsequent w ditch removal. of Phase Il bond release. <br />Construct approved modifications to sediment Prior to formal request for final bond <br />pond for permanent retention. release. <br /> <br />484 Revised: 10!27/99 <br />Minor Revision All <br />