My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44671
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:07 PM
Creation date
11/20/2007 12:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
page 454 - 539
Section_Exhibit Name
SECTION 2.05 OPERATION PLAN PART 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ESTIMATED <br />• ACTIVITY TIME FRAME <br />Re-test soils in areas showing less vegetative cover; evaluate Completed 10/98 <br />suitability pazameters. <br />Evaluate revegetation success on reclaimed mine site (year 3 Completed 10/98 <br />evaluation). <br />Submit report to the Division, including soil and vegetation data, Completed, and submitted with <br />documenting vegetation success and reclamation recommendations. 1998 Annual <br />Reclamation Report <br />Perform inter-seeding and fertilizer application on non-topsoiled RDA Completed 10199 <br />slope areas (approx. 5.0 acres), as approved by the Division. <br />Proposed work to include application of chemical fertilizer (20-20-10) <br />at 200 Ibs/acre, and drill seeding and/or broadcast seeding at the <br />approved seeding rate. Seeding will be done in approximately l5 feet <br />wide strips, along the contour, with IS feet wide strips between left <br />undisturbed. <br />Construct closed contour furrows on areas exhibiting rills and gullies, <br />• conswMed in accordance with Rill and Gully Plan. <br />Completed 1 l /99 <br />Construction of Refuse Ditch No. 1 Extension Completed 10/99 <br />Perform fertilizer and manure application, inter-seeding, and Complete by 5/31/00 <br />mulching on non-topsoiled RDA slope areas west of Refuse Ditch <br />extension (approx. 3.4 acres), shown on Figure 2, pg. 488. Proposed <br />work to include application of chemical fertilizer (30 Ib/acre as P2O5), <br />and approximately 456 cu. yds. of manure/ wood chips/straw mixture <br />to obtain 25~ organic material by volume of top 4 inches of soil. <br />Incorporate fertilizer and manure mix in soil with chisel plow or disc <br />plow. This soil preparation will be done to both incorporate the <br />manure and conserve the existing soil structure. Seed mixture (shown <br />on Table 3, pg. 525) will be broadcast on plowed surface, then the <br />same seed mix, minus the shrubs, will be drilled at half the rate <br />shown. Operation of drill will be on the contour. Apply 4,000 Ib/ <br />acre of weed-free, sloughgrass hay, or equivalent long-stem hay on <br />the surface and crimp into the surface. <br />• <br />485 Revised; 03/23/00 <br />Minor Revision #17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.