Laserfiche WebLink
Ci> The first 50 foot lift has been constructed to a grade of <br />~• approximately 1.9A:1.OV which is milder than that in the <br />approved permit. <br /><2) There are ao bulges, cracks, slips or slumps anywhere is the <br />emban3oneat. Compaction teats are good and the embanlonent is <br />sound. <br />(3) Water levels have consistently been below the toe of the <br />refuse, ae measured by the refuse well. <br />C4> With the exception of some rill sad gullying on the first <br />slope, there have been ao problems with surface water <br />drainage. <br />C5> Leachable constituents lrom the refuse have also not been a <br />problem. Chemical analysis of the sediment pond discharge <br />has not shown any major increases in problem ions. <br />• <br /> <br />472 <br />Revised 1/88 <br />