My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44628
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:05 PM
Creation date
11/20/2007 12:00:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Permit File
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />is <br />mining is completed, the steep west headwall shall be <br />graded to a finished finish backslope of no steeper than 3H <br />1V by bulldozer "cut and fill" shaping. After increasing <br />the permit financial warranty to include mining of Unit <br />II, stockpiled overburden outside the north edge of Unit I <br />(in Unit II) shall then be dozed into the excavated pit <br />along with the estimated 4~t-foot depth of overburden that <br />overlies the south half of Unit II. The overburden dozed <br />back into Unit I worked-out pit shall then be smoothed to <br />nearly flat and topsoiled with the Unit I topsoil that was <br />stockpiled west of Unit I. A wheeled elevating scraper <br />shall be used to spread the topsoil. Revegetation seeding <br />and mulching shall follow topsoiling at the next climatic <br />opportunity. <br />Permit financial warranty shall be adjusted to credit for <br />reclamation work performed and/or partially complete in Unit <br />I mining area, and increased to include the stripping of <br />topsoil from Unit III. <br />MINING UNIT II <br />The 6 to 12 inches of topsoil covering Unit III shall be <br />stripped and stockpiled 25 feat west of the west edge of <br />that unit, beginning 400 feet north of the permit/property <br />southwest corner and extending north the 150-foot width of <br />that unit. The remainder of overburden from the north half <br />of Unit II shall be bulldozed into a berm just north of Unit <br />II (within the south half of Unit III). <br />~~~~- -- <br />I I ~ topsail <br />~T~s'I <br />I I 6 <br />Leo' _ <br />L~7TC III <br />5--..a- - - _ J' <br />4 00 <br />~T~S~ I uNrr n ,~- <br />I ovsrburden ~ ~ PROC/STOCK <br />~ 450' <br />Extraction of Unit II gravel resources shall begin at the <br />east edge of the unit and proceed at full depth of the <br />deposit (estimated at 8 to 12 feet) and at the full 150-foot <br />width to the west end. Processing and stockpiling of gravel <br />products extracted shall occur simultaneously in the <br />formerly used 4-acre pros/stock area to the south east. <br />
The URL can be used to link to this page
Your browser does not support the video tag.