Laserfiche WebLink
<br /> <br />~s <br />Extraction and loading of the processing equipment feeder <br />shall be, as before, done by wheeled front-loader. <br />When the available gravel resources are mined to exhaustion <br />in Unit II mining area the permit financial warranty shall <br />be increased to include the mining activity of Unit III, <br />which is the 150-foot wide area immediately north of Unit <br />II. The overburden that was earlier dozed north into a <br />Unit III berm shall be dozed back into the Unit II excava- <br />tion, along with the overburden that naturally lies over the <br />south half of Unit III. Such material shall be spread <br />evenly over the worked-out pit floor of Unit II to match <br />the finished grade of the formerly reclaimed Unit I <br />area, except that the triangular shaped east 225 feet of <br />Unit 22 worked-out pit floor shall be left un-backfilled <br />in order that it may be utilized as an extension of the <br />process/stockpile area (and thus allow access to Unit III <br />mining). The steep Unit II west headwall shall be sloped <br />to 3H to 1V by "cut ~ fill" dozing. Topsoil from the <br />stockpile west of Unit II shall then be spread evenly over <br />the smoothed, backfilled surface of the unit. At the <br />appropriate climatic opportunity the finished surface <br />shall be reseeded and mulched per the project seeding <br />specification. Portions of Unit II reclamation completed <br />shall be requested to be released from the financial <br />warranty at the appropriate time. <br />MINING UNIT III ~ SUCCEEDING UNITS <br />Unused southerly portions of the initial Proc/Stock area <br />shall be vacated, rip-loosened, topsoiled, and revegetated <br />for release from the permit financial warranty. The finan- <br />cial warranty shall also at this time be increased to <br />include stripping of topsoil from Unit IV to be stockpiled, <br />as before, 25 feet to the west of that unit. The balance of <br />overburden from above the north half of Unit III shall, as <br />before be dozed to the north in a berm in the south half of <br />the next 150-foot wide IInit IV. <br />Mining of gravel from IInit III, and succeeding units shall <br />be similar to the previous units, beginning at the east end <br />of each stripped unit and proceeding west at full width of <br />the unit (150 feet) and full depth of the available resource <br />(9 to 12 feet). Processing and stockpiling of produced <br />material shall be similarly conducted in the described <br />Proc/Stock area to the southeast As before, the worked- <br />