Laserfiche WebLink
<br />EXHIBIT 19 <br />MR~Z <br />PUMP DISCHARGE BUILDINGS <br />A. Building Removal <br />Rock Dust Bin Foundation Area <br />324 sq.ft. x $1.50/sq.ft.= <br />Bulk Floc Tank Containment <br />256 sq.ft. x $1.50/sq.ft.= <br />B. Concrete Pads <br />Rock Dust Bin Foundation Area <br />144 sq. ft. x $1.50/sq.ft.= <br />Bulk Floc Tank Containment <br />included in MR 35 Bonding <br />C. Backfill and Grading/Topsoil and Seeding <br />Area previously disturbed and is already <br />included in current bond. No additional <br />bonding required. <br />TOTAL <br />$ 486 <br />384 <br />216 <br />0 <br />0 <br />$1,086 <br />• <br />