Laserfiche WebLink
<br />Exploration Bond Summary <br />• Attachment 10 Exhibit 1 (Continued) <br />d) Haul water: 21 trips x $50./trip..$ 1,050. <br />e) Marker: 21 markers x $12........ $ 252. <br />Labor: 1 man x $15./hr x 21 hrs..$ 315. <br />Cement:21 sacks x $7./sack.......$ 147 <br />f) water cost:$25./load x 21 loads...$ 525. <br />Total Ccst: (a + b + c + d + e + f) ................$ 34,790. <br />6. Cut and Fill <br />Common earth, minimal haul distance <br />16,888 total yards x $0.75/yd .......................$12,666. <br />7. Mobilization and Demobilization: <br />a) Drill rig and associated equipment..$ 1,000. <br />b) Dozer and grader ....................$ 300. <br />c) Move from site to site ..............$ 2,000. <br />• Total Cost: (a + b + c) ............................$ 3,300. <br />8. Contingency for State Agency Oversight Expenses.....5 4,200. <br />TOTAL ESTIMATED BONDING REQUIREMENT :............. / ....$ 82,230. <br />• <br />