Laserfiche WebLink
<br />$RHIBIT 19 <br />BONDING SCSSDIILE <br />FAN HAFFLB <br />MR 75 <br /> <br />1) Baffle Demolition <br />A. Tear down of structure <br />Crane 4 hours ® $125/hr <br />Labor 4 hours ~ $ 20/hr <br />B. Haulage to scrap yard <br />2) Foundation Removal <br />A. Concrete footing <br />500 sq.ft. ® $2.90/sq.ft. <br />3) Grading and Seeding <br />A. Currently included in existing bond <br />TOTAL <br />$500 <br />$ 80 <br />$150 <br />$1,450 <br />S O <br />$2,180 <br />• <br />