Laserfiche WebLink
2 <br />5. Conveyor Structure, Transfer House at Breaker Bldg. 4,950 <br />Steel Framing 4" x6" <br />4 x 200' @ $4.70/ft. _ $ 3,760 <br />Cover (30" x 72") <br />200' @ $4.77/ft. = 954 <br />Remove Belt and Structure 200' <br />20'/hr. @ $24.00 = 240 <br />Backfillino and Gradinq 3,522 <br />Excavating Sorrow <br />1,000 CY (Max.) @ 0.84 840 <br />Backfill 300' haul common earth <br />1,000 CY (Max.) @ $2.13 2,130 <br />Grading <br />1 day @ $552 552 <br />Reveaetation 0 <br />• (Surface is previously disturbed and <br />bonded for spreading subsoil, topsoil <br />and reseeding) <br />State Requested Additional Bonding 99 <br />TOTAL BOND REQUIRED $ 29,000 <br /> <br />