Laserfiche WebLink
<br /> <br />EXHIBIT 19 <br />SCHEDULE TR-20 <br />(Bonding Calculations for TR-20) <br />Structure Removal <br />1. Slope Belt Transfer Point <br />10' x 12' x 10' = 1,200 Ft.2 <br />1,200ft.2 @ $0.29 = $ 340 <br />2. Conveyor Structure to Drop Tube <br />Steel Framing 4" x6" <br />4 x 200' @ $4.70/ft. _ $ 3,760 <br />Cover (30" x 72") <br />200' @ $4.77/ft. = 954 <br />Remove Belt and Structure 200' <br />20'/hr. @ $24.00 = 240 <br />3. Transfer House and Drop Tube <br />10' x 12' x 10' = 1,200 ft.2 <br />1,200 ft.2 @ $0.29 = 348 <br />Drop Tube Steel 10' Dia. x 100' <br />3,150 ft.2 @ $0.29 911 <br />4. Reclaim Tunnel <br />Concrete 6" Rod reinforced <br />4 x 8'x 1g0' + 8'x 8' _ <br />3,264 ft. @ $2.12 = 6,936 <br />Ventilation/Escape Tunnel <br />Concrete 6" rod reinforced <br />4 x 8'x 1~0' + 8'x 8' _ <br />3,264 ft. @ $2.12 = 6,936 <br />$ 348 <br />4,950 <br />1,259 <br />13,872 <br />C~ <br />