Laserfiche WebLink
<br />~~ <br />EXfiIBIT 19 <br />Bonding Schedule - Technical Revision 25 <br />pond 005 Lining <br />1. Removal of pond lining <br />A. 80,000 eq.ft. at ;0.06/eq.ft. 14,800 <br />Z. Grading and Seeding <br />(Area is already bonded for grading, needing, <br />and revegetatiort- No increase in acreage) 0 <br />TOTAL 54,800 <br />• <br />• <br />