Laserfiche WebLink
~J <br />EXHIBIT 19 <br />SCHEDULE MR-34 <br />Bonding Calculations for MR-34 <br />Containerized Petroleum Product Storage <br />Structure Removal <br />1. Roof of galvanized Steel sheeting with <br />metal I-beam legs and cross-members <br />Steel sheeting 400 S.F. @ $0.60/S.F. _ $ 240 <br />3" I-Beam/Channel x 195' x 5.0 lbs/Ft <br />@ $150/Ton = $ 73 <br />2. Concrete Foundation <br />Dimensions: 10' Wide x 40' Long <br />Concrete pad 6" Reinforcement, wire mesh <br />400 S.F. x $4.01 = $1,604 <br /> <br />Concrete walls 6" with rod reinforcement <br />110 S.F. @ $2.90/S.F. $ 319 <br />Backfilling and Gradino <br />None required. <br />Reveaetation <br />Surface is previously disturbed and bonded <br />for spreading subsoil, topsoil, and reseeding. <br />None required. <br />TOTAL $2,236 <br />Basis: Means 1992 Facilities Cost Data <br /> <br />