Laserfiche WebLink
<br />EXHIBIT 19 <br />SCHEDULE MR-33 <br />Bonding Calculations for MR-33 Additional Water Storage Tanks <br />Structure Removal <br />1. Water Storage Tank Removal <br />0.250" steel plate 18' Dia. x 24'H <br />1,866 S.F. x 5.5 lba/S.F. x ton/ 2000 lbs = <br />5.1 tons x $150/ ton x 2 tanks = $1,530 <br />2. Concrete Foundation <br />Dimensions: 18'Dia x 24" Wide x 12" Deep <br />Concrete average reinforcement <br />113 S.F. x 10.60 + 108 = 1,320 <br />Backfilling and Grading <br />None required. <br />• Reveaetation <br />Surface is previously disturbed and bonded <br />for spreading subsoil, topsoil, and reseeding. <br />None required. <br />TOTAL $2,850 <br />Basis: Means 1992 Facilities Cost Data <br />• <br /> <br />