Laserfiche WebLink
C~ <br />EXHIBIT 19 <br />SCHEDULE MR-32 <br />a.,r.::ing Calculations for MR-32 Bulk Emulsion Oil Storage <br />Structure Removal <br />1. Bulk Storage Tank Removal $ 500 <br />(Skid mounted surface. Transport to certified <br />Salvage Facility) <br />2. Concrete Containment Basin <br />Dimensions: 16' x 32' x 4' <br />Pad = 512 S.F. x 6" reinforced wire mesh <br />@ $4.05 per S.F. $2,074 <br />Walls = 384 S.F. x 6" reinforced wire mesh <br />@ $2.90 per 5.F. $1,114 <br />Backfilling and Grading <br />• None required. <br />Revegetation <br />Surface is previously disturbed and bonded <br />for spreading subsoil, topsoil, and reseeding. <br />None required. <br />TOTAL $3,680 <br />Basis: Means 1992 Facilities Cost Data <br />n <br />\J <br />