Laserfiche WebLink
• EXHIBIT 19 <br />SCHEDULE MR-35 <br />Bonding Calculations for tiR-35 <br />Bulk Storage of Nalco 7883 6 7885 Flocculant <br />Structure Removal <br />1. Bulk Storage Tank Removal $ 500 <br />(Storage tanks are furnished by Nalco. <br />Bonding is based on estimated transport <br />charge for return to Nalco.) <br />2. Concrete Containment Basin <br />Dimensions: 10' x 20' x 4' <br />Pad = 200 S.F. x 6" reinforced wire mesh <br />@ $4.05 per S.F. $ 810 <br />Walls = 240 S.F. x 6" reinforced wire mesh <br />@ $2.90 per S.F. $ 690 <br />• Backfillino and Gradinq <br />None required. <br />Reveoetation <br />Surface is previously disturbed and bonded <br />for spreading subsoil, topsoil, and reseeding. <br />None required. <br />TOTAL <br />Basis: Means 1992 Facilities Cost Data <br />$1,500 <br /> <br />