My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44073
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:32 PM
Creation date
11/20/2007 11:48:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/2/2007
Doc Name
New Application
From
Energy Fuels Resources Corporation
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Four 500-gallon diesel fuel tanks on the Whirlwind Pad azea as shown on Map C-2, called the <br />fuel station, immediately west of the ore pad. These tanks will be installed within larger <br />livestock tanks (approx. 700-gallons each). Removal cost: $2,200 <br />- Magnesium Chloride Tank located neaz the portal. The tank size is 1,000 gallons and it will be <br />contained within a soil berm. Removal cost: $500 <br />- Propane tank (portable), 500 gallons. <br />- Fence azound water treatment azea and mine entrance. Removal cost: $1,500 <br />- Concrete sump (6 feet x 6 feet) which drains from the ore pad area to a pipe (the HDPE pipe <br />will remain buried in the backfill) Removal cost: $1,000 <br />- 2 powder magazines: Removal cost $1,000. <br />- Watchman's trailer: (portable) <br />Subtotal of removal costs: $14,700. <br />The following structures will be removed at the Packrat Portal area: <br />• - Retaining wall, approximately 300 feet in length, with an average height of 8 feet and a <br />maximum height of 22 feet. This wall will be made of steel supports with wood beams. <br />Removal cost: $10,000. <br />- Concrete jersey barriers of 100 feet total length, which will be hauled off site and re-used. <br />Removal cost $2,500. <br />- Up to four steel bins for the loading of ore and waste. These bins will be 22 feet high for truck <br />loading underneath, and an upper bin storage azea of 12 feet x 12 feet. Removal cost for 4 bins: <br />$10,000 <br />- Shop door, approximately 12 feet wide by 8 feet high. This door will be removed and the <br />opening blocked in prior to regrading. Removal cost: $300 <br />Subtotal of removal costs: $22,800. <br />No other structures will require removal at the Packrat portal. <br />•~ Total Removal costs of structures: $37,500. <br />Whirlwind Mine June 07 E-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.