My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 021 <br />Date : 02/25/2003 <br />User : JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name ;Colorado Division Of Minerals And <br />Permit or other job action ;Permit Renewal 02 <br />Task description : Regrade Leach Field <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL OUANTRIES <br />Initial <br />volume : 9, 000 <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. t :BOPS Cab <br />Attachment no. 2 : 3•shank ripper <br />Ownership cosUhour: <br />Operating cosUhour <br />Ripper op, cosUhour. <br />Operator cosUhour: <br />Total unit cosUhour <br />Swell <br />8CY factor <br />Utilization <br />$53.00 NA <br />$8721 100 <br />$0.00 0 <br />$24.01 NA <br />$164.22 - Totalileet cosUhour: <br />Loose <br />1.250 volume; 5,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet . <br />Unadjusted hourly production : 1,243.2 LCYlhr <br />Material consistency descripiion <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock • 25% Aock, <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />0.00 % (/ <br />6,400 feet <br />2.650 Ibs/LCY <br />75% Earth <br />1 Dozers) <br />$0.340 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />v.~a <br />Adjusted unit production : 483.43 LCY/hr <br />Adjusted fleet production : 483.43 LCY/hr <br />Total job time : 10.34 Hours <br />Total job cost : $1,698 <br />PermiUjob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-021 <br />Source <br />$164.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.