Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 020 State :Colorado <br />Date : 02/25/2003 County : Rouft <br />User : JRS Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division Of Minerals And Geclog~ <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regfade All D/tCheS <br />HOURLY EQUIPMENT COST <br />Permitlob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-020 <br />Basic machine : (:at D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. t : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> _ <br />Utilization _ <br />_ <br />Cost Breakdown : Ownership cosUhour :_ $53.00 NA <br />OperatingcosUhour: $87.21 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour: $24.01 NA <br />Total unit cost/hour: $164.22 Total fleet cost hour: $764.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,000 ~ BCY factor: 1.250 volume: 72,500 LCY <br />Source of estimated volume :Exhibit 12-2 _ <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors. <br />Operator skill : _ <br />Average push distance : 100 feet Materia! consistency <br />Unadjusted hourly production : 1.243.2 LCY/hr Dozing method : , <br />Visibility : _ <br />Material consistency description : Job efficiency <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,400 feet <br />Material weight : 2, 650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.340 /LCY <br />Spoil pile <br />Push gradient : ~_ <br />Altitude <br />Material weight : i <br />Blade type : _ <br />Net correction <br />0.75 <br />Source <br />(av9J <br />(Cat HB) <br /> <br /> <br />Adjusted unit production : 483.43 LCY/hr <br />Adjusted fleet production : 483.43 LCY/hr <br /> <br />Total job time : 25.86 Hours <br />Total job cost : $4,246 <br />