Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task ff : 019 <br />Date : 02/25/2003 <br />User: JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division Ot Minerals And Geology <br />Permit or other job action :Permit Renewa102 <br />Task description : Regrade Rail Loop Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br /> <br />Blatle type _ <br />:Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> <br />Attachment no. 2 : _ <br />3-shank ripper <br />Data source : (CRG) <br />Ownership cosUhour <br />Operating cosVhour <br />Ripper op. cosUhour: <br />Operator cost/hour: <br />Tataf unit cosUhour : $764.22 Total fleet cosUhour <br />1 fiQ12 <br /> S <br /> MATERIAL QUANTITIE <br /> Initial Swell Loose <br /> volume : 3,000 BCY factor : 1.250 volume : 3,750 LCY <br /> Source of estimated volume :Operator Estimafe <br /> Source of estimated swell factor :CAT Handbook <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 150 feet Material consistency : 0.90 _ <br />(Cat HB <br /> Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.83 (lshitUda <br /> Compactedlill or embankment Spoil pile : 0.80 (fnd-d) <br /> Push gradient : 1,00 (Cat HB <br /> Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB <br /> Average site altitude : 6,400 feel Material weight : 0.87 (Cat H8 <br /> Blade type : 1.00 (S/SU/L <br /> Material weight : 2,650 fbs/LCY Net correction : 0.39 <br /> Weight description <br /> Decomposed rock - 25% Rock, 75°o Earth Adjusted unit production : 354.06 LCY/hr <br /> Adjusted fleet production : 354.06 LCY/hr <br /> <br /> JOB TIME AND COST <br /> Fleet size : 1 Dozers) Total job time : 10.59 Hours <br /> Unit cost : $0.464 /LCY Total job cost : $1,738 <br />Utilization <br />$53.00 NA <br />$8721 100 <br />$0.00 G <br />$24.01 NA <br />Permit/job# : C-92-081 <br />Abbreviation :none <br />Filename : CO87-079 <br />