Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task tt : 018 <br />Date : 02/25/2003 <br />User : /R'S <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Truck Loop Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Basic machine :Cat D9R - 9SU Horsepower: <br />4 <br />0 <br />5 <br /> <br />81ade type ___ <br />_ <br />. <br />____ <br />: Semr-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : Y per day_ _ <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Ownership cosVhour : $53.00 NA <br />Operating costlhour : _ <br />$87.21 100 <br />Ripper op. cosUhour : _ <br />_ $0.00 G <br />Operator cosUhour: _ $24.Oi NA <br />Total unit cosUhour : $164.22 Total fleet cost hour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 1,000 BCY factor : 1.250 <br />Source of estimaied volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/br <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (~ <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 fbs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75°% Earth <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) <br />Unit cost : $0.340 - /LCY <br />PermiUobq : C-92-081 <br />Abbreviation :none <br />Filename : C081-018 <br />R15d92 <br />Loose <br />volume : 1,250 LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Nel correction <br />Data source : (CRG) <br />v. ~a <br />Adjusted unit production : 483.43 LCY/hr <br />Adjusted fleet production : 483.43 LCY/hr <br />Total job time : 2.59 Hours <br />Total job cost : $Q2$ <br />Source <br />C~ <br /> <br /> <br />