Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER -ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O/ Minerals And Geology <br />Task # : 024 State :Colorado PermiUob # : C-92-081 <br />Date : 02/25/2003 County : Routt Abbreviation :none <br />User : JRS Site : Havden Gulch Loadout Filename :C087-024 <br />Permit or other job action :Permit Renewa102 __ <br />Task description :Replace Topsoil from Stockpile to Rail Loop and Facilities Area <br />HOURLY EQUIPMENT COST <br />Model :Cat 627G w/push-pull <br />Cost Breakdown : Job utilization <br /> Ownership cosVhour : $46.13 NA <br /> Operating cosUhour : $104.74 fOG <br /> Operator cost/hour: ,$2543 NA <br /> Total unit cosUhour : $775.70 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 80, 180 ~ ~ CCY factor : 1.125 volume <br />Source of quantity takeoff :Exhibit 10-1 <br />Source of estimated swell factor :CAT Handbook <br />Shift basis : 1 per day <br />Horsepower : 590 <br /> <br />Weight (UST) __ <br />: 42.04 <br /> <br />Cost data source ___ <br />: (CRG) <br />$351.40 <br /> <br />90,202 LCY <br />HOURLY PRODUCTION <br />Hauling CaoaciN <br />Basis <br />Matedal tlescdpfion <br />Earth -Dry packed <br />Rated payload: 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Cvcle lime (load + haul + soread + return) <br />Travel time <br />Bows (volume) Basis <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />Loading time : 0.90 minuses ' <br />Maneuver and spreading time :_ 0.60 - minutes <br />loading Ime par pair onpush-pull modeb <br />Route Distance (feet) Grade (%) Roll. res.(%) Tetai res.(°/) ~ Velocity (fpm) I Travel time (min.) <br />Haul : ~ 2,000 3.0 5.0 8.0 7,387 7.45 mutes " <br />Return: 2,000 -3.0 5.0 ~ 2.0 2,905 0.69 inures '• <br />" Uaval lime adlusletl for acceleration aM deceleralbn at batl and tlump points <br />vebcities are maz. anainable per total residence shown, not average Total Cycle time <br />Job Condition Correction Factors <br />Site altitude (feet) : 6,400 Adiusted Hourlv Production <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production <br />Job efficiency factor : 0.83 (1 shifVdayJ Adjusted unit production <br />Adjusted fleet production <br />Net job correction factor : 0.83 - ~ z Mmes wwme on pooh-pan models <br />3.64 minutes <br />_ 560.95 LCY/Hour"' <br />465.59 LCY/Hour <br />465.59 LCY/Hour <br />JOB 71ME AND COST <br />Fleet size : 2 - Scraper(s) Total job time : 193.74 Hours <br />Unil cost : $0.755 /LGY Total job cost : $68, 081 <br /> <br />`J <br /> <br />