My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : 071 <br />Date : 02/25/2003 <br />User : JRS <br />CIRCES Cost Estimating Software <br />BULt_DOZER WORK <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Naul Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Ownership cost/hour : $53.00 NA <br />Operating cosUhour : $87.21 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $24.01 NA <br />Total unit cosUhour : $164.22 Total fleet cosUhour <br />S16d22 <br />Initial Swell Loose <br />volume : 5,370 BCY factor : 1.250 volume : 6,712 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill: 0.75 _(avg.) <br />Average push distance : 100 feet Materia! consistency : ~ 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr ~ Dozing method : ~ 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (fshiff/day <br />Compacted /ill or embankment Spoil pile : 0.60 (Ind-d) <br /> Push gradient : i.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) ~ Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.87 (Cat HBJ <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Decomposed rock - 25% Rock, 75°% Earth Adjusted unit production : 483.43 LCV/hr <br /> Adjusted fleet production : 483.43 LCV/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 13.89 Hours <br />Unit cost : $0.340 /LCY Total job cost : 52,280 <br />PermiUjob# : C-92-081 <br />Abbreviation :none <br />Filename : C081-011 <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.