My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : OOB State :Colorado <br />Date : 02/25/2003 County : Routt <br />User : JRS Site :Hayden Gulch Luadout <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Permit or other job acfion :Permit Renewal 02 <br />Task description :Rip Ramp Roads <br />HOURLY EQUIPMENT COST <br />.. Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $53.66 NA <br />Dozer operating cosUhour: $87.21 100 <br />Ripper operating cosUhour : $11.08 100 <br />OperatorcosUhour: $30.65 NA <br />Total unit cost/hour : $182.59 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic <br />Area <br />NA NA <br />2.75 acres <br />Selected estimating method <br />Area <br /> <br /> <br />Load factor : NA Bank volume : NA BCY <br />Rip depth (tt) : 3.00 Volume : 13,310 BCY or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimafed Toad factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic: Seismic velocity: NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 4.05 feeUpass <br />Average ripping width : 6.08 feeUpass <br />Average ripping length : 200.00 feeUpass <br />Average dozer speed: 88.00 teeUminute <br />Average maneuver lime : 0,25 minutes/pass <br />Production per unit area : 0.664 acres/hour <br />Unadjusted production : 4,338.16 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0,051 per cu. yd. <br />Basic machine :Cat D9R - 9SU Horsepower :_ __4__05____ <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis :_ 1 per day <br />Attachment no. 2 : 1-shank ripper <br />Unadjusted production <br />per selected method : 4,338.16 cu. yds./haur <br />Site altitude : 6,400 feet <br />Altitude adjustment : 1.00 (Cat RB) <br />Job efficiency factor : 0.83. (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production <br />Atljusted fleet production <br />Permitrob # : C-92-081 <br />Abbreviation :none <br />Filename : C081-008 <br />Total job time <br />Total job cost <br />3,600.67 cu. yds./hour <br />3,600.67 cu. ydsJhour <br />3.70 hours <br />$675 <br />Data source : (CRG) <br />S l A259 <br />
The URL can be used to link to this page
Your browser does not support the video tag.