My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43959
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:26 PM
Creation date
11/20/2007 11:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatino Software <br />BULLDOZER WORK <br /> <br />Task i1: 072 <br />Date : 02/25/2003 <br />User: JRS <br />State :Colorado <br />County : Routt <br />Site :Hayden Gulch Loadout <br />PermiUobq : C-92-087 <br />Abbreviation :none <br />Filename : C081-012 <br />Agency or organization name :Colorado Division OlMinerals And Geology <br />Permit or other job action :Permit Renewal 02 <br />Task description : Regrade Ramp Roads <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 4 <br />0 <br />5 <br />Blade type :Semi-Universal __ <br />. <br />. <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day _ <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> <br />Utilization _ <br />Cost Breakdown : Ownership cost hour : $53.00 ~ NA <br />Operating cosVhour : $8721 f00 <br />Ripper op.cosVhour : <br />$0.00 0 <br />Operator cost/hour _ <br />: $24.01 NA <br />Total unit cosUhour : $164.22 Total fleet cost/hour: $764.22 <br />MATERIAL QUANTITIES - <br />Initial Swell Loose <br />volume : 4,444 BCY factor : .1.250 volume : 5,555 LCY <br />Source of estimated volume :Division Estimate __ <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Compacted Litt or embankment <br />100 feet <br />1,243.2 LCY/hr <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 6,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factors <br />Operator skill : _ <br />Material consistency <br />Dozing method :^ <br />Visibility :~_ <br />. Job efficiency :_ <br />Spoil pile :_ <br />Push gradient :_ <br />Altitude <br />Material weight _ <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Source <br />(av9~) <br />(Cat HB) <br />r.w I (oro< <br />0.39 <br />483.43 LCY/hr <br />483.43 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 11.49 Hours <br />Unit cost : $0.340 lLCY Total job cost : 61,887 <br />
The URL can be used to link to this page
Your browser does not support the video tag.