Laserfiche WebLink
A ~ M • <br />~,~~„ <br />6.3.3. EXHIBIT C - Mining Plan <br />We plan to mine the sand and gravel in individual <br />cells of about one acre starting at the east (upstream) <br />end and moving the operation westward as each pit is ex- <br />hausted. The bottom of each pit will slant against the <br />normal slant of the land providing a ponding area to catch <br />flash floods. This will provide rich humus to add to the <br />sand for reclamation. When the desired amount of sand is <br />removed from one pit -- another will be started downstream and <br />the old pit will be reclaimed. This will heave an undulating <br />effect on the overall profile. <br />