Laserfiche WebLink
• <br />GEX COLORADO INC. <br />RECLAMATION PLAN <br />UNIT TRAIN LOADOUT FACILITY <br /> Unit <br />Item uantit Unit Cost Cost <br />Removal of Structures <br />labor 7,745 Man/Hr S 17.20 $133,214 <br />Equipnent 3,600 hr 29.30 105,480 <br />Earthwork <br />Excavation 168,100 Cu-Yd ~ 1.00 168,100 <br />Fill 38,200 Cu-Yd <br />Spreading Topsoil 44,400 Cu-Yd 1.25 55,500 <br />Drill Seeding 55 Acre 40.00 2.200 <br />Mulching 55 Acre 175.00 9,625 <br />Nydroseeding & Mulching Acre 900.00 <br />Fertilizer Acre 372.00 <br />Seed 55 Acre 64,00 3,520 <br />Totals $477,639 <br /> <br />