Laserfiche WebLink
• <br />GEl( COLORADO INC. <br />RECLAMATION PLAN <br />RAILROAD SPUR AND OVERLAND CONVEYOR <br /> Unit <br />Item uantit Unit Cost Cost <br />Removal of Structures <br />Labor 1,516 Man/Nr E 11.20 S 26,075 <br />Equipment 699 hr 29.30 20,481 <br />Earthwork <br />Excavation 6,700 Cu-Yd 1.00 6,700 <br />Fill Cu-Yd <br />Spreading Topsoil 9,100 Cu-Yd 1.25 14,550 <br />Drill Seeding 12 Acre 40.00 480 <br />Mulching 12 Acre 175.00 2,100 <br />Uydroseeding b Mulching Acre 900.00 <br />Fertilizer Acre 372.00 <br />Seed 12 Acre 64.00 768 <br />Totals $ 71,154 <br /> <br />