Laserfiche WebLink
• <br />GEX COLORADO INC. <br />RECLAMATION PLAN <br />CAMEO REFUSE DISPOSAL AREA <br />Item <br />Removal of Structures <br />Labor <br />Equipnent <br />Earthwork <br />Excavation <br />Fill <br />Spreading Topsoil <br />Drill Seeding <br />Mulching <br />Nydroseeding & Mulching <br />fertilizer <br />Seed <br />Totals <br />Unit <br />uantit Unit Cost Cost <br />150 Man/Nr b 11.20 E 2,580 <br />60 hr 29.30 1,158 . <br /> Cu-Yd <br />9,100 Cu-Yd 1.50 13,650 <br />48,828 Cu-Yd 1.25 61,035 <br />10 Acre 40.00 400 <br />10 Acre 115.00 1,750 <br />22 Acre 900.00 19,800 <br />22 Acre 312.00 8,184 <br />32 Acre 64.00 2,048 <br /> $111,205 <br /> <br />