Laserfiche WebLink
• <br />GE% COLORADO INC. <br />RECLAMATION PLAN <br />NORTH DECLINE - S17E PLAN <br /> Unit <br />Item uantit Unit Cost Cost <br />Removal of Structures <br />Labor 150 Man/Hr 3 11.20 S 2,580 <br />Equipment 60 hr 29.30 1,758 <br />Earthwork <br />Excavation 41.600 Cu-Yd 1.00 41,600 <br />Fill - Refuse 81,500 Cu-Yd <br />Spreading Topsoil 8,100 Cu-Yd 1.25 10,125 <br />Drill Seeding 10 Acre 40.00 400 <br />Mulching 10 Acre 175.00 1,750 <br />Hydroseeding & Mulching Acre 900.00 <br />Fertilizer Acre 372.00 <br />Seed 10 Acre 64.00 640 <br />Totals 8 58,853 <br /> <br />