Laserfiche WebLink
' ~p~nd~x fl <br /> <br /> Page 49 <br /> Construction Materials Rule 3 <br /> f <br />' <br /> it is the Operator <br />s responsibility to provide the Office notice o <br />any <br /> proposed bacldill activity not identified in the approved Reclamation Plan. <br />' If the Office does not respond to the Operator's notice within thirty (30) <br /> days after receipt of such Notice by the Office, the Operator may proceed <br /> in accordance with the provisions of this Rule. The Operator shall maintain <br /> a Financial Warranty at all times adequate to cover the cost to stabilize and <br /> cover any exposed bacldllled material. The Notice to the Office shall <br /> include but is not limited to: <br />' (a) a narrative that describes the approximate location of <br /> the proposed activity; <br /> (b) the approximate volume of inert material to be <br /> bacldrlled; <br />' (c) a signed affidavit certifying that the material is clean <br />and inert, as defined in Rule 1.1(20); <br /> (d) the approximate dates the proposed activity will <br />' commence and end, however, such dates shall not be an enforceable <br /> condition; <br /> (e) an explanation of how the baclsfilled site will result <br />' in apost-mining configuration that is compatible with the approved <br /> post-mining land use; and <br />' (f) a general engineering plan stating how the material <br /> will be placed and stabilized in a manner to avoid unacceptable <br /> settling and voids. <br /> 116(a)(c) (10) All mined material t0 be disposed Of Wlthin the affected area <br /> must be handled in such a manner so as to prevent any unauthorized release <br />' of pollutants to the surface drainage system. <br /> 116(a>(~ (11) No unauthorized release of pollutants to groundwater shall <br /> occur from any materials mined, handled or disposed of within the permit <br /> area <br /> 3.1.6 Water -General Requirements <br />116(a)(h) (1) Hydrology and Water Quality: Disturbances to theprevailing <br />hydrologic balance of the affected land and of the surrounding area and to <br />the quantity or quality of water in surface and groundwater systems both <br />' during and after the mining operation and during reclamation shall be <br />m;n;mi~rri by measures, including, but not limited to: <br />(a) compliance with applicable Colorado water laws and <br />regulations governing injury to existing water rights; <br />1 <br />Cl <br />