My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42728
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:10 PM
Creation date
11/20/2007 11:17:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005077
IBM Index Class Name
Permit File
Doc Date
2/7/2006
Doc Name
Information
From
MAP Surveys Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 4 Reclamation 12012-2013) <br />Biock 1 Gravel processing and storage. <br />Block 2 Re-vegetated except for road to mining, processing and stockpile areas. <br />Block 3 Re-vegetated except for road to mining, processing and stockpile areas. <br />Block 4 Re-vegetated except for road to mining, processing and stockpile areas. <br />Block 5 Re-vegetating topsoil from Block 7. <br />Block 6 Distribute topsoil from Block 8 on reshaped areas. <br /> Fall 2012 -Start re-vegetation. <br />Block 7 Remove topsoil to reshaped areas of Block 5. Remove overburden to mined out <br /> areas of Block 6. <br /> Gravel extraction. <br />Block 8 Fall 2013 -Remove topsoil to reshaped areas of Block 6. Remove overburden to <br /> mined out areas of Block 7 & gravel extraction. <br />Block 9 Unaffected. <br />thru <br />Block 22 <br />Phase 5 Reclamation 2014-2015 <br />Block 1 Move gravel processing & stockpiles to Block 7 and 8. <br /> Idle except for road access to mining, processing and stockpile areas. <br />Block 2 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Block 3 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Block 4 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Block 5 Re-vegetated except far road access to mining, processing and stockpile areas. <br />Block 6 Re-vegetating topsoil from Block 8. <br />Block 7 Fall 2014 - re-vegetation most of the block and berm areas of topsoil from Block <br /> 9. Gravel processing and storage at easterly part of the black. <br />Block 8 Gravel processing and storage moved from Block 1 w/detention berm of topsoil <br /> from Block 10. <br /> Fall 2014 - Re-vegetate topsoil berms from Block 9. <br />Block 9 Remove topsoil and distribute most of Block for berm on 7 & 8. Remove <br /> overburden and reshape mined out Block 8. Gravel extraction. <br />Block 10 Fall 2015 -Remove topsoil 8 distribute to reshaped areas of Biock 8. Remove <br /> overburden to mined out areas of Block 9. Gravel extraction. <br />Block 11 Unaffected. <br />thru <br />Block 22 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.