My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42728
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:10 PM
Creation date
11/20/2007 11:17:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005077
IBM Index Class Name
Permit File
Doc Date
2/7/2006
Doc Name
Information
From
MAP Surveys Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upland Gravel has formulated a timetable for this site based on the removal of <br />material at the rate of 40 K-60 K ton annually. Timetables are subject to changes <br />dictated by market demand for construction and landscape materials. The <br />timetable is prepared in two year phases for mining and reclamation activities for <br />the life of the reserves. <br />Phase 1 Reclamation 2006-2007 <br />Block 1 Remove topsoil and gravel from face of slopes for construction of 3000 feet of haul road <br /> between Block 1 and the end of haul road in Springfield Estates. <br /> Use overburden to construct processing and stockpile area. Set up crusher and <br /> equipment and begin gravel processing. <br /> Fall 2007 - Re-vegetate fill slopes of processing site. <br />Block 2 Fail 2006 -Remove topsoil and distribute to berms on Block 1. Remove overburden and <br /> reshape mined out Block 1. <br /> Gravel extraction <br />Block 3 Unaffected. <br />thru <br />Block 22 <br />Phase 2 Minin 2008-2009 <br />Block 1 Gravel processing and storage. <br /> Fall 2008 - Re-vegetate topsoil berms from Block 2 <br />Block 2 Gravel extraction <br />Block 3 Fall 2008 -Remove topsoil and distribute to reshaped areas of Block 1. <br /> Remove overburden and distribute to mined out areas of Block 2. <br />Block 4 Fall-Winter 2009 -Remove topsoil and distribute to reshaped areas of Block 2 <br /> and 3. Remove overburden and reshape mined out areas of Block 3. <br />Block 5 Unaffected. <br />thru <br />Block 22 <br />Phase 3 Reclamation 2010-2011 <br />Block 1 Gravel processing and storage. <br />Block 2 Idle - Re-vegetating topsoil. <br />Block 3 Idle - Re-vegetating topsoil from Block 5. <br />Block 4 Gravel extraction. <br /> Fall 2010 - Re-vegetate topsoil from Block 6. <br />Block 5 Remove topsoil and distribute to reshaped areas of Block 3. Remove overburden <br /> and reshape mined out areas of Block 4. <br /> Gravel extraction. <br />Block 6 Fall 2011 -Remove topsoil and distribute to reshaped areas of Block 4. Remove <br /> overburden and reshape mined out Block 5 <br /> Gravel extraction <br />Block 7 Unaffected. <br />thru <br />Block 22 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.