My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42728
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:10 PM
Creation date
11/20/2007 11:17:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005077
IBM Index Class Name
Permit File
Doc Date
2/7/2006
Doc Name
Information
From
MAP Surveys Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 6 Reclamation (2018-2017) <br />Block 1 Re-vegetated except for road access to mining, processing and stockpile areas. <br />thru <br />Block 7 <br />Block 8 Gravel processing and stockpile area. <br />Block 9 Fail 2016 - Re-vegetate topsoil from Block 11. <br />Block 10 Summer 2016 -Gravel extraction & distribute overburden from Block 11. <br /> Fall 2017 - Re-vegetate topsoil from Block 12. <br />Block 11 Summer 2016 -Remove topsoil and distribute on Block 9. Remove overburden <br /> to Block 10 <br /> Gravel extraction. <br /> 2017 -Reshape overburden from Block 12. <br />Block 12 2017 -Remove topsoil and distribute on Block 10. <br /> Remove overburden to mined out Block 11. <br />Block 13 Unaffected. <br />thN <br />Block 22 <br />Phase 7 Reclamation (2018 - 2019) <br />Block 1 Re-vegetated except for road access to mining, processing and stockpile areas. <br />thru <br />Block 7 <br />Block 8 Gravel processing and storage w/detention berm. <br />Block 9 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Block 10 Re-vegetated except for road access to mining, processing and stockpile areas. <br />Block 11 Fall 2018 - Re-vegetate topsoil from Block 13 except for road access to mining, <br /> processing and stockpile areas. <br />Block 12 Summer 2018 -Gravel extraction & distribute overburden from Block 13. <br /> Fall 2019 - Re-vegetate topsoil from Block 14. <br />Block 13 Summer 2018 -Remove topsoil and distribute to Block 11. Remove overburden <br /> to reshape Block 12. <br /> Gravel Extraction. <br /> Reshape overburden from Block 14. <br />Block 14 Summer 2019 -Remove topsoil and distribute to Block 12. Remove overburden <br /> to mined out Block 13 and 14. <br /> Gravel extraction. <br />Block 15 Unaffected. <br />thru <br />Block 22 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.